
Looking at the stats above, leads me to believe that they aren't going to be very real for everyone..
For instance, one of the posts above, "Tauciu5" resides in Lithuania, Vilnius. I believe that is somewhere in Northern Europe? He has been told by Ableton first week of July.
I'm in the US, Ableton told me 8-16 weeks. My account says 8-12 weeks. This is telling me to bite the bullet and settle -in for the long haul.
I'm thinking along the lines of "August", OMG!
I have to be honest, I'm really tired of all this waiting. I realize there have been production setbacks, but hey, this is the second time for me waaai..ting
Unfortunately my first Push had to be returned for a blemish that I refused to live with. I was just getting into the swing of things with it and beginning to realize my workflow improvements and then Bam, it was gone.
I now feel that a major part of my DAW and Keys are missing. Good luck to all that are in waiting also.