Peak Meter Refresh Rate
Posted: Fri Apr 19, 2024 12:28 pm
Good Afternoon Sports fans,
Does anyone know whether it is possible to increase that rate at which the peak meter updates?
When a signal is fed through a track the peak meter reading 'hangs' for a few seconds before moving and I'd like to try and change this function to it is more immediate.
Thanks
Does anyone know whether it is possible to increase that rate at which the peak meter updates?
When a signal is fed through a track the peak meter reading 'hangs' for a few seconds before moving and I'd like to try and change this function to it is more immediate.
Thanks