Page 1 of 1

Testing Live on new Intel Mac

Posted: Wed Jan 11, 2006 4:17 am
by bizack
I live pretty close to an Apple Store, and I've downloaded the demo version of Ableton Live to try out on a machine in the store before (when I was looking at the 1.67 GHz PowerBooks). I figure I'll drop by the store this weekend, download Live onto an Intel iMac, and see what happens (i.e. if Live works with Rosetta). I'll report back after testing this out...

Posted: Wed Jan 11, 2006 4:24 am
by smutek
There's one about 20 minutes from my house and I considered doing the same. But the notebooks aren't shipping till February so they wont have them instock yet.

The iMacs apparently are available via the website but I doubt they will be in stock in the retail stores already.

I would atleast call first.

Posted: Wed Jan 11, 2006 5:22 am
by bencodec
hey, i work at tekserve in manhattan, don't worry as soon as the first intel imac arrives i'll test ableotn on it and post the results.

Posted: Wed Jan 11, 2006 6:54 am
by Globaldj
You guys should test it out on the new MacBook Pro

Posted: Wed Jan 11, 2006 10:16 am
by FORMAT
Globaldj wrote:You guys should test it out on the new MacBook Pro
Exactly... can't someone who visits the Mac Expo do this for us?

Posted: Wed Jan 11, 2006 10:35 am
by D DAS
steve jobs said they are working on the g5 powerbooks

that is why they switched to intel

I am holding off for the those

Posted: Wed Jan 11, 2006 10:53 am
by jeskola
D DAS wrote:steve jobs said they are working on the g5 powerbooks

that is why they switched to intel

I am holding off for the those

i wouldnt hold your breath!!

Posted: Wed Jan 11, 2006 11:06 am
by polyslax
bencodec wrote:hey, i work at tekserve in manhattan, don't worry as soon as the first intel imac arrives i'll test ableotn on it and post the results.
Damn! That's like a shrine!

Posted: Wed Jan 11, 2006 11:26 am
by robin
D DAS wrote:steve jobs said they are working on the g5 powerbooks

that is why they switched to intel

I am holding off for the those
working on them....and gave up.

it's intel all the way now. g5 is IBM.

i do believe this macbook is an interim machine though.

Posted: Wed Jan 11, 2006 12:48 pm
by inis
D DAS wrote:steve jobs said they are working on the g5 powerbooks

that is why they switched to intel

I am holding off for the those
yes, unfortunetly, i think you are about two years behind in your keynote addresses.